Projects for the Ministry of Construction and Housing
Beneficiary:
General Authority for Roads and Bridges
Location:
Governorates of Salah ad-Din - Diyala
Projects started:
2008
Date of completion:
2009
The need to revitalize the process of establishing, rehabilitating and repairing road and bridge networks, especially after wars, in order to rehabilitate the destroyed areas either by war or natural consumption.
The main objective of road rehabilitation is to enhance traffic safety and reduce traffic accidents that cause daily life loss and cause considerable material losses for both individuals and governmental institutions, in addition to reducing internal and external traffic congestion that wastes time and energy, which would stimulate the economic wheel.
khuzaimi road project
Rehabilitation of diyala – habhab streets
Maintenance of samarra-tikrit bridge
Technical Description:
The company implemented the Khuzaimi road project on 4 stages with a length of 16,500 km.
The first stage was opening a path through hills and then applying layers of soil in different proportions. And then constructing concrete pipes in the low areas of the road, and finally covering the road with two layers of asphalt.
As for the Habhab district project in Diyala province, we scraped the old kerosene asphalt layer and then covered the internal streets with the new asphalt layer and sprayed treated asphalt coating material and finally full rehabilitation of the pedestrian paths.
The company has signed a maintenance contract for this project to oversee the expansion joints of the Samarra-Tharthar Bridge.
All joints of the expansion were maintained by lifting the old joints and connecting new joints with a length of 2 km along the bridge. While fitting reinforced rubber joints of T100 and T50 measurements.