Projects for
the Ministry of Electricity
Beneficiary: Department of operation and control
Location: Baghdad Governorates, Diyala, Salahuddin, Babylon
Projects started: 2008
Date of completion: 2009
Despite the increasing use of digital communications systems - especially those using fiber optic links - the DPLC-DIGC (Digital power line carrier) are still the most cost-effective and reliable solution. This is especially true when small amounts of data need to be transferred over long distances.
The installation of communications equipment project processing and transfer of information
Technical Description:
Within the framework of our cooperation with the Department of Operation and Control in the Ministry of Electricity, the technical staff of Future City Company implemented the installation and operation of the DPLC-Power Power Line Carrier system in several governorates in Baghdad. These lines were equipped with 10 Connections at secondary power stations where each positive link required the presence of two opposite devices at two different stations, which would increase the system's efficiency and ability to transmit larger data for longer distances.