Water is the easiest and the most precious and limited of Iraq's natural sources, and so several governmental bodies have been established to manage water and its resources in the best way possible. Iraq seeks to achieve the concept of sustainable development in the field of water security, where the city of the future is keen to contribute effectively to this vision, through development projects for the Ministry of Water Resources, and promote, control and optimally utilize all water resources in the country for the development of the agricultural sector, which is the most important economic oil alternatives currently adopted.
Corrosion treatment project for the euphrates river (left side)
Lining and opening the duhan tunnel / world bank projects
Technical Description:
The company constructed a number of irrigation and drainage projects for the General Authority, such as the treatment project of the left side of the Euphrates River in Muthanna Governorate.
The work included covering the area with clean layers of soil, channel refinement and layer adding processes. In addition to stone cladding of the section and building ladders for operations and maintenance and periodic cleaning of the river. In addition to soil work, and paving asphalt roads.
The company has also rehabilitated the Abu Sakhaa irrigation project in Al Qadisiyah Governorate, where the work included stone covering for both sides of the canal and lining the channel for a length of 1 km while establishing secondary watering channels. The company has a contract to maintain the Darbandakhan Dam in Sulaymaniyah Governorate, which includes mechanical works for the dam gates, welding works for damaged areas and laying pipes in the dam body.
The company also contracted to cover the Duhan channel, the project is one of the World Bank's initiatives in the Wasit Governorate. The project started by coating the sides of the channel with concrete C20 or stabilized concrete for water insulation for over 5,200 meters. With a thickness of 8 cm. The channel section was cleaned and cleared of clay deposits and weeds and then drying along with the execution of excavation work and covering with clean soil with a percentage of 95%. The channel section was then opened according to the designs prepared for concrete lining works. And finally opening watering sub-canals linked to the channel.